Re: Managing Demand around legacy ERP - tips & techniques?
Rob Berendt <[email protected]>
| Newsgroups | gmane.comp.systems.as400.bpcs |
|---|---|
| Message-ID | <OFB643D6F7.B6F1A905-ON85257FC5.00510D4A-85257FC5.0051C52A@corp.dekko.com> |
And, when we upgraded from BPCS 405CD to Infor LX we really minimized
modifications.
We were heavily modified (after all, we are the 4th customer BPCS ever had
and the oldest one still running it).
We've been through the 34-36-AS400-IBMi upgrades and several flavors of
BPCS -2.1-405-405CD-LX-... and more planned.
Of course one can question if this is "minimal" when you have 2,942
objects in the ERPLXUSRO library which is the user modified object
library.
Rob Berendt
--
IBM Certified System Administrator - IBM i 6.1
Group Dekko
Dept 1600
Mail to: 2505 Dekko Drive
Garrett, IN 46738
Ship to: Dock 108
6928N 400E
Kendallville, IN 46755
http://www.dekko.com
From: Rob Berendt <[email protected]>
To: BPCS ERP System <bpcs-l-Zwy7GipZuJhWk0Htik3J/[email protected]>
Date: 06/01/2016 10:30 AM
Subject: Re: [BPCS-L] Managing Demand around legacy ERP - tips &
techniques?
Sent by: "BPCS-L" <bpcs-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]>
We have a formalized work flow (Domino based) in which user requests are
processed.
Our users would not be happy with a 'release cycle' approach. The whole
having to wait a quarter (or more if you're towards the end of the quarter
and locked into QC Testing) just would not fly.
A few decades back I worked for Kasinec Independent Software Specialists
so I've heard of Stryker.
Rob Berendt
--
IBM Certified System Administrator - IBM i 6.1
Group Dekko
Dept 1600
Mail to: 2505 Dekko Drive
Garrett, IN 46738
Ship to: Dock 108
6928N 400E
Kendallville, IN 46755
http://www.dekko.com
From: "Kelly, John (Limerick)" <[email protected]>
To: "BPCS-L-Zwy7GipZuJhWk0Htik3J/[email protected]" <BPCS-L-Zwy7GipZuJhWk0Htik3J/[email protected]>
Date: 06/01/2016 10:21 AM
Subject: [BPCS-L] Managing Demand around legacy ERP - tips &
techniques?
Sent by: "BPCS-L" <bpcs-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]>
I have a non- technical BPCS related query that I would welcome this
group's input on. I am looking for any tips and techniques you and/or your
organisations employ in the area of Demand Management (i.e. user request
changes/enhancements) in relation to your ERP systems. I am particularly
interested in legacy ERP.
The reason for my query is my organisation is looking to put together a
structured approach to manage demand to operate across a number of ERP
platforms. The one I support is BPCS (sys 38, v3.6 - so it's pretty old!).
To date we have operated an ad hoc approach;
* User raises a request
* Our group assess the request to determine the level of BPCS
development required
* Subject to approval we then proceed with development, testing and
eventual deployment
Going forward we are being challenged to come up with a more structured
approach to managing user demand. In addition instead of deploying
enhancements on an ad hoc basis we may also consider moving to a release
cycle, whereby changes would be 'bunched' together and implemented in a
predetermined timeframe (e.g. quarterly). To complicate things further
this approach is to be adopted across a number of ERP platforms, not just
'my' BPCS environment
I would be interested then in seeing if how you deal with Demand
Management and also Release Management as it relates to your environment
-e.g. what challenges you faced in developing and implementing these
processes, lessons learned, what you might do differently were you to
start all over again etc.
Kind regards,
John.
--
This is the BPCS ERP System (BPCS-L) mailing list
To post a message email: BPCS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/bpcs-l
or email: BPCS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/bpcs-l.
--
This is the BPCS ERP System (BPCS-L) mailing list
To post a message email: BPCS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/bpcs-l
or email: BPCS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/bpcs-l.
--
This is the BPCS ERP System (BPCS-L) mailing list
To post a message email: BPCS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/bpcs-l
or email: BPCS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/bpcs-l.