Re: FW: Partial Quantity Issues
Madhusudhan <m_devagiri-/[email protected]>
| Newsgroups | gmane.comp.systems.as400.bpcs |
|---|---|
| Message-ID | <[email protected]> |
Les Mittman - SBC <lmittman@...> writes: > > Just to clarify, Scrap Factor and Yield are two (2) different things in > BPCS. > > The BOM Scrap Factor is applied to the specific Component on the BOM. Each > BOM Component can have a Scrap Factor defined. That is, a 2% Scrap Factor > would be expressed as 1.02000. This value is used as a multiplier for the > BOM Quantity Required for the Component in order to calculate the Total > Quantity Required. So, if the BOM Quantity is 100, the Planned Quantity > (which is used for MRP, SFC, and CST) will be 100 * 1.02 = 102. > > Yield is applied at the Parent Item and is expressed as at percent (e.g. > 95). In effect, a 5% increase will be required for the Parent Quantity in > order to achieve the desired Resulting or Planned Quantity. The impact is > that Yield on the Parent will appear as if the Scrap Factor has been applied > to each of the BOM Components. But, that impact is because the Parent > Quantity is increased which in turn will blow through the BOM. > > Thank. > > Les Mittman > > BPCS Consultant > > 847-858-5235 > > -----Original Message----- > From: bpcs-l-bounces+lmittman=sbcglobal.net@... > [mailto:bpcs-l-bounces+lmittman=sbcglobal.net@...] On > Behalf Of Al > Sent: Saturday, July 18, 2009 12:48 PM > To: 'BPCS ERP System' > Subject: [BPCS-L] FW: Partial Quantity Issues > > YIELD is sometimes known as "scrap factor." > > The field is MBM.BMSCP > > Default is 1.0 meaning 100%. > > 1.08 means consume an extra 8%. > > Al Macintyre > Hi , I faced an issue where the Parent is required quantity 100. But the Child BOM's are not reflecting the required quantity as multiples of 100. In Example: Parent1 : 1 Child 1 Required : 2 Quantity Child 2 Required : 5 Quantity My Shop Order is for 100 quantity for Parent Item Then all the Child Items under the Parent, required quantity should be reflecting as 100 * quantity But in my case , one of the child item is not reflecting the *100 i.e Child 1 Required (in FMA ) : Required quantity is 100 *2 Child 2 Required (in FMA) : Required quantity is 5 (This should be 500, but showing only 5) Kindly let me know if any setup missing to check -- This is the BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l.