Re: MRP Time Fence.
| Newsgroups | gmane.comp.systems.as400.jbausers |
|---|---|
| Message-ID | <OFEDA0AB57.1631F433-ONCA2573D2.000E9E1D-CA2573D2.000F46D3@sandvik.com> |
Hi Jim MSP71 is populated by the values entered when you start an MRP run either manually (MR002) or via Auto run parameters (for MM submission in Aurora). These values are also output at start of run to the MR003PT report. Start Date = run date - overdue days as entered on the screen Time Fence date = run date + time fence days as entered on the screen End Date = date as entered ( or run date + entered days for Auto Run) Not sure about Forecast time fence as we don't use it. BR Rick Allen IT Manager IT Sandvik Mining and Construction Australia Office: +61 (0)2 4985 2622 Mobile: +61 (0)419 494 705 Fax: +61 (0)2 4985 2626 Mailto:[email protected] http://www.sandvik.com This e-mail is confidential and it is intended only for the addressees. Any review, dissemination, distribution, or copying of this message by persons or entities other than the intended recipient is prohibited. If you have received this e-mail in error, kindly notify us immediately by telephone or e-mail and delete the message from your system. The sender does not accept liability for any errors or omissions in the contents of this message which may arise as a result of the e-mail transmission. "Jim Kerr" <JKerr-FaIC0pVkSM6w7v2zf2itdNJR4SXAr38/@public.gmane.org> Sent by: system21-bounces-Zwy7GipZuJhWk0Htik3J/[email protected] 16/01/2008 12:12 PM Please respond to System 21 Users <system21-Zwy7GipZuJhWk0Htik3J/[email protected]> To "'System 21 Users'" <system21-Zwy7GipZuJhWk0Htik3J/[email protected]> cc Subject [SYSTEM21] MRP Time Fence. On the MRP Inquiry summary screen (MR050), there are 4 dates displayed at the top of the screen; Start 5/11/07 Time Fence 6/26/09 F/C Time Fence 1/16/08 End 6/26/09 I am interested in knowing what creates the value for the "Time Fence" and "End" dates. These fields appear to be taken from file MSP71, fields PSTF71 and PSED71 respectively. I also note that there is a value in field LTIW71 (Purchasing lead time) of 420, does this get used in calculating the time fence and end date and if so, where is that value coming from ? TIA, Jim. _______________________________________________ This is the System 21 Users (SYSTEM21) mailing list To post a message email: SYSTEM21-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/system21 or email: SYSTEM21-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/system21. _______________________________________________ This is the System 21 Users (SYSTEM21) mailing list To post a message email: SYSTEM21-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/system21 or email: SYSTEM21-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/system21.