Re: R78 Client Install
"Kevin Fox" <[email protected]>
| Newsgroups | gmane.comp.systems.as400.mapics |
|---|---|
| Organization | Kevin Fox |
| Message-ID | <[email protected]> |
Your url for the install should look something like: <your computer name>:36001/PowerLink What is your actual url for the client install? Kevin Fox -----Original Message----- From: mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected] [mailto:mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]] On Behalf Of [email protected] Sent: Thursday, October 01, 2009 9:13 AM To: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] Subject: [MAPICS-L] R78 Client Install Hello All, I have been working to install the R78 Client software. The process is part of the R78 Install/upgrade procedure announced and made available in June. The green screen server installation and upgrade to PCM 09955 went pretty well. I have not tried the data migration yet. I am struggling with the Client Install. The last time I ran the Client install, it ran for over 8 hours before it failed. I am being told by Infor the install will "run for a long time unless I have a locally attached PC." I'm not sure what is meant by "locally attached PC". I am installing to an iSeries Model 570. The main reason I have been given for the installation length of time is due to the large amount of data being transferred and installed on the IFS. I am also being told bandwidth and network latency are also contributing to the length of time required. From my previous experiences and tracking the installation, I can see what has been installed. Unfortunately, I can't see the finish line. It sounds like the good-old "This may take some time" message. Because of the change in the installation process, the install must be done from a PC. You cannot insert an install CD/DVD into the iSeries and install from there. Has anyone experienced the same lengths-of-time associated to the installation? Are there any suggestions I can try to help with the process? Thank You, Sam Delaquila Application Administrator Eaton Electrical _______________________________________________ This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l. _______________________________________________ This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l.