Need help with MRP
| Newsgroups | gmane.comp.systems.as400.mapics |
|---|---|
| Message-ID | <OF7A196699.92F86601-ON852577C7.006A7DF7-852577C7.006B1F13@gecomcorp.com> |
Hello, I have two Infor packages. One is AutoRelease (for EDI) and the other is XA 7.7. What I am trying to do is split the weekly (from AutoRelease) buckets into daily buckets in MRP. Looked through the manuals and they were not any help. Has someone else been able to do this within XA? Orville Meredith Systems Analyst Gecom Corporation 1025 Barachel Lane Greensburg, IN 47240 [email protected] 812-663-1745 (T) 812-663-2230 (F) 812-718-9028 (C) (Travel, after 4:00 p.m. weekdays, and weekends ONLY) == This message has been scanned for viruses == _______________________________________________ This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l.