Re: Need help with MRP (daily production load requirements)

[email protected]
Newsgroups gmane.comp.systems.as400.mapics
Message-ID <OFBA091C65.321AE1F2-ON852577C8.0068D9EF-852577C8.0068F565@gecomcorp.com>
Dale,

Thank You.



Orville Meredith
Systems Analyst

Gecom Corporation
1025 Barachel Lane
Greensburg, IN  47240

[email protected]

812-663-1745 (T)
812-663-2230 (F)

812-718-9028 (C)
(Travel, after 4:00 p.m. weekdays, and weekends ONLY)



                                                                       
             Dale                                                      
             Gindlesperger                                             
             <dale_gindlesperg                                          To
             er-/[email protected]>             MAPICS ERP System Discussion  
             Sent by:                  <mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]>       
             mapics-l-bounces@                                          cc
             midrange.com                                            
                                                                   Subject
                                       Re: [MAPICS-L] Need help with MRP
             10/26/2010 02:05          (daily production load          
             PM                        requirements)                   
                                                                       
                                                                       
             Please respond to                                         
             MAPICS ERP System                                         
                Discussion                                             
             <mapics-l@midrang                                         
                  e.com>                                             
                                                                       
                                                                       




Orville,

I did this for a prior employer - not integrating AutoRelease, but a daily
scheduling application that I used to simulate an advanced planning
solution (I
didn't have the budget to acquire AVP).  How I did it was to take the
output
from the daily scheduling application, clear all firm planned orders from
MPSP
for the planner designated for the end items, and programmatically create
firm
planned orders for each day's scheduled production.  This was done
immediately
prior to our weekly (or more frequent as required) MPSP/MRP process.

Since we generally built to a planned overall schedule for a total number
of
units, this worked well for us.  It wasn't an ideal solution, but was quite

effective for us while we were producing that product line.  It basically
gave
us the benefit of maintaining a somewhat flexible daily production schedule
and
also gave us the benefits of planning all components in MRP (we produced
between
80-90% of the components in house).  In other words, we integrated a demand

planning process at the top end, with a batch ordering process at the lower

levels.

It actually wasn't that difficult to do.  However, having said that, it
only
worked for us because we were able to maintain a steady level of production
at
the top level/end item level, and there was a fairly high percentage of
common
components for that product.


I had intended to extend that process to other areas of the company, but
the
company decided to abandon that product line before I was able to do so.

 Dale (Cork) Gindlesperger, CPIM






________________________________
From: "[email protected]" <[email protected]>
To: mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]
Sent: Mon, October 25, 2010 3:31:07 PM
Subject: [MAPICS-L] Need help with MRP


Hello,

I have two Infor packages.  One is AutoRelease (for EDI) and the other is
XA 7.7.  What I am trying to do is split the weekly (from AutoRelease)
buckets into daily buckets in MRP.  Looked through the manuals and they
were not any help.

Has someone else been able to do this within XA?



Orville Meredith
Systems Analyst

Gecom Corporation
1025 Barachel Lane
Greensburg, IN  47240

[email protected]

812-663-1745 (T)
812-663-2230 (F)

812-718-9028 (C)
(Travel, after 4:00 p.m. weekdays, and weekends ONLY)

== This message has been scanned for viruses ==
_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.



_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.

_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.