Re: Implementing Standard Costing
"LeLeux, James" <[email protected]>
| Newsgroups | gmane.comp.systems.as400.mapics |
|---|---|
| Message-ID | <03B42F10470C7A47B3571990353A253B15356E34C5@JKVMAILBOX1.spsfastener.com> |
Thanks all. Especially to Dave Turbide for the generous offer below, and to Mike Taylor @ Cistech for an implementation plan! Regards...james James LeLeux IT Director: Cherry, Shur-Lok, & SPS Santa Ana 1224 East Warner Avenue Santa Ana, CA 92705 M 714-929-8063 [email protected] -----Original Message----- From: mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected] [mailto:mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]] On Behalf Of Dave Turbide Sent: Tuesday, January 11, 2011 5:24 AM To: mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected] Subject: Re: [MAPICS-L] Implementing Standard Costing I'm on vacation this week so only checking email once a day. I'd be happy to chat with you about converting to standard costing. In addition to setting the interfaces, you'll need to decide on a number of procedural issues including how "standard" you want to be. MAPICS gives you a number of choices in tailoring and there are procedures you'll want to set up to gather the information and get it posted in the right places. I usually don't recommend automatic posting to G/L of everything that MAPICS is capable of doing - there are some variance calculations that are better done manually, in most cases. That said, the G/L interface can gather a lot of data for you that you can manually post and/or use to validate info that you gather in other ways so it makes sense to "activate" even if you aren't going to automatically post. Anyway, if you can wait a couple days I'd be happy to spend some time with you on the phone next week. If there's something critical, drop me an email directly at [email protected] with your phone number and I'll call you. Dave Turbide CSCP, CFPIM, CMfgE, CIRM [email protected] office: (603) 964-6903 cell: (603) 401-0192 Website: www.daveturbide.com Mon, 10 Jan 2011 17:35:41 -0500 from: "LeLeux, James" <[email protected]> subject: [MAPICS-L] FW: Implementing Standard Costing Happy New Year all! I am looking at implementing standard costing (XA R6) and was curious if anyone knew of any guides from Infor or other sources to assist. I see that we need to re-tailor from Actual to Standard (what will that impact?). We currently use actual costing, but it is well structured outside of MAPICS. And not sure about this other PCC question currently set to NO: C17 DO YOU WANT TO HAVE GENERAL LEDGER DISTRIBUTION? Do the Router Variance (RV), Purchasing Variance (PV), and Material Usage Variance (MUV) reports come out of AMC530 (Order closeout and purge)? Are there any practical guides to the parameters for AMC530 as well as cost roll-ups? I did search the ML, but it was very issue specific, and I'm still at the 10,000 foot level. Thanks in advance for any direction you may provide! Looks like we have all out interfaces on except one: ENTER INTERFACE SELECTION: 1 - DEACTIVATE 2 - ACTIVATE SEL FROM APPLICATION TO APPLICATION 2 Accounting Mgmt Accounts Payable Accounting Mgmt General Ledger 2 Accounting Mgmt Accounts Payable Inventory Management 2 Accounting Mgmt Accounts Payable Production Control and Costing 1 Accounting Mgmt Accounts Receivable Accounting Mgmt Accounts Payable 2 Accounting Mgmt Accounts Receivable Accounting Mgmt General Ledger 2 Customer Order Management Accounting Mgmt Accounts Receivable 2 Customer Order Management Master Production Schedule Planning 2 Customer Order Management Material Requirements Planning 2 Inventory Management Customer Order Management 2 Inventory Management Material Requirements Planning 2 Inventory Management Product Data Management 2 Inventory Management Production Control and Costing 2 Master Production Schedule Planning Material Requirements Planning 2 Material Requirements Planning Inventory Management 2 Material Requirements Planning Product Data Management 2 Payroll Accounting Mgmt General Ledger 2 Payroll Production Control and Costing 2 Product Data Management Inventory Management 2 Product Data Management Material Requirements Planning 2 Production Monitoring and Control Inventory Management 2 Production Monitoring and Control Payroll 2 Production Monitoring and Control Production Control and Costing 2 Purchasing Material Requirements Planning James LeLeux IT Director: Cherry, Shur-Lok, & SPS Santa Ana 1224 East Warner Avenue Santa Ana, CA 92705 M 714-929-8063 [email protected]<mailto:[email protected]> ******** _______________________________________________ This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l. _______________________________________________ This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l.