Driving manufactured components for multiple locations
Connie Webb <cwebb-mcPmRQV/[email protected]>
| Newsgroups | gmane.comp.systems.as400.mapics |
|---|---|
| Message-ID | <0BA0D0DBC0F8B944B8442E3178CFE1300148CA4A74@GWMAIL2.grahamwhite.com> |
We ship manufactured component parts to several locations that do repair work on our manufactured items. Currently we drive production by placing customer orders and deleting the customer order when components are produced. The in-transit inventory functionality is used to move inventory between locations. Short of buying multi-site logistics is anyone driving material by a more creative method? Connie Webb | Database Administrator | 540.387.5600 x272 Graham-White Manufacturing Co.<http://www.grahamwhite.com/> | Providing Reliable Transportation Solutionsâ„ This email and any files transmitted with it are confidential and intended solely for the use of the individual to whom they are addressed. If you are not the intended recipient, be aware that disclosing, copying, distributing, or taking any action in reliance on the contents of this information is strictly prohibited. Please notify the sender immediately by email if you have received this email in error and delete this email from your system. -- This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: [email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: [email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l.