RE: Prompt for Overwrite does not work in VS.NET Integration
"Chris Mullins" <[email protected]> Tue, 2 Mar 2004 21:38:44 -0800
| Newsgroups | gmane.comp.version-control.sourcegear-vault.user |
|---|---|
| Message-ID | <[email protected]> |
Vault did do a great job storing the original files in the backup directory, so recovering them did work.... -- Chris _____ From: Chris Mullins Sent: Tuesday, March 02, 2004 9:27 PM To: [email protected] Subject: [vault-list] Prompt for Overwrite does not work in VS.NET Integration Open a project in Source Control Make a bunch of changes. Right-Click on the Solution, and (by mistake) click "GetLatest" instead of "Check In". Think for a moment "Do I kill the process or let it finish?". All checked-out files are overwritten. "Prompt on Overwrite" is enabled in the Vault GUI. -- Chris