Re: Soak tests
"MORTON, ALFRED C (AL)" <[email protected]>
| Newsgroups | gmane.ietf.bmwg |
|---|---|
| Message-ID | <4AF73AA205019A4C8A1DDD32C034631D45963B25A4@NJFPSRVEXG0.research.att.com> |
Thanks for your comment, Steve. There is some value in continuing to test after an error, to see if the system recovers to the pre-error throughput for example, but I agree that there are likely to be events after which it would make sense to observe recovery if it happens and stop. Al > -----Original Message----- > From: bmwg [mailto:[email protected]] On Behalf Of Dr Steven A. > Wright > Sent: Wednesday, July 20, 2016 5:56 AM > To: [email protected] > Subject: [bmwg] Soak tests > > > We had some discussion around soak tests, as to what the appropriate > duration should be and whether ( or what) the performance metric was > under measurement. > > I would suggest that these tests should be measured as the duration of > stable operation under load. The measurement period starts when full > load is achieved on the system under test and terminated when (1) > received load (throughput) variation exceeds some threshold (5%?) or (2) > some system exception/ failure occurs. The test may be terminated after > some user defined period. The user defined period for the test is > usually greater than 24 hrs to catch intermittent/ probabilistic system > scheduling conflicts that interfere with stable operation. > > Regards > Steven Wright > > _______________________________________________ > bmwg mailing list > [email protected] > https://www.ietf.org/mailman/listinfo/bmwg