Fwd: Milestones Update
Margaret Wasserman <[email protected]>
| Newsgroups | gmane.ietf.entmib |
|---|---|
| Message-ID | <[email protected]> |
Hi,
Please update the Entity MIB (entmib) WG milestones to match the attached
list.
Thanks,
Margaret
P.S. Merry Christmas, Bert! :-)
---
Done Post Internet-Draft for Entity MIB.
Done Post updated Entity MIB Internet-Draft.
Done Submit final version of Internet-Draft for consideration as a
Proposed Standard.
Done Finalize scope of changes/augmentations to RFC 2037
Done Post updated/new Internet Drafts
Done Reach agreement on changes/extensions to RFC 2037
Done Evaluate status of RFC 2037 and report to the IESG if it should be
recycled at Proposed or can be elevated to Draft Standard.
Done Submit Internet Draft containing Entity MIB Extensions to IESG for
consideration
as a Proposed Standard.
Done Evaluate status of Entity MIB and collect implementation and
interoperability
reports
Done Recommend to the IESG if Entity MIB can be elevated to Draft Standard.
Done Post Internet-Draft for Sensor Entity MIB
Done Determine if the Entity MIB should be modified to resolve any open
issues
Done Submit final version of Internet-Draft for Sensor Entity MIB for
consideration
as a Proposed Standard
JAN 02 Publish state/status extensions as a WG I-D
MAR 03 Submit state/status extensions to the IESG for Proposed Standard
MAR 03 Evaluate status of the Entity MIB and collect implementation and
interoperability reports
MAR 03 Evaluate status of the Sensor Entity MIB and collect implementation and
interoperability reports
MAY 03 Submit the Entity MIB to the IESG for Draft Standard.
MAY 03 Submit the Sensor Entity MIB to the IESG for Draft Standard
JUN 03 Re-charter or shut-down the WG