RE: Milestones Update
"Wijnen, Bert (Bert)" <[email protected]>
| Newsgroups | gmane.ietf.entmib |
|---|---|
| Message-ID | <7D5D48D2CAA3D84C813F5B154F43B15583CFC0@nl0006exch001u.nl.lucent.com> |
Approved by AD Thanks, Bert > -----Original Message----- > From: Margaret Wasserman [mailto:[email protected]] > Sent: donderdag 19 december 2002 20:11 > To: [email protected] > Cc: Bert Wijnen; [email protected] > Subject: Fwd: [Entmib] Milestones Update > > > > > > Hi, > > Please update the Entity MIB (entmib) WG milestones to match > the attached > list. > > Thanks, > Margaret > > P.S. Merry Christmas, Bert! :-) > > --- > > Done Post Internet-Draft for Entity MIB. > Done Post updated Entity MIB Internet-Draft. > Done Submit final version of Internet-Draft for consideration as a > Proposed Standard. > Done Finalize scope of changes/augmentations to RFC 2037 > Done Post updated/new Internet Drafts > Done Reach agreement on changes/extensions to RFC 2037 > Done Evaluate status of RFC 2037 and report to the IESG if > it should be > recycled at Proposed or can be elevated to Draft Standard. > Done Submit Internet Draft containing Entity MIB > Extensions to IESG for > consideration > as a Proposed Standard. > Done Evaluate status of Entity MIB and collect implementation and > interoperability > reports > Done Recommend to the IESG if Entity MIB can be elevated > to Draft Standard. > Done Post Internet-Draft for Sensor Entity MIB > Done Determine if the Entity MIB should be modified to > resolve any open > issues > Done Submit final version of Internet-Draft for Sensor > Entity MIB for > consideration > as a Proposed Standard > JAN 02 Publish state/status extensions as a WG I-D > MAR 03 Submit state/status extensions to the IESG for > Proposed Standard > MAR 03 Evaluate status of the Entity MIB and collect > implementation and > interoperability reports > MAR 03 Evaluate status of the Sensor Entity MIB and collect > implementation and > interoperability reports > MAY 03 Submit the Entity MIB to the IESG for Draft Standard. > MAY 03 Submit the Sensor Entity MIB to the IESG for Draft Standard > JUN 03 Re-charter or shut-down the WG > >