RE: AD Review: draft06 draft-ietf-ipcdn-pktc-mtamib-06.txt ( Comm ent 13)

"Eugene Nechamkin" <[email protected]> Mon, 12 Sep 2005 15:05:01 -0700
Newsgroups gmane.ietf.ipcdn
Message-ID <24CDBA67F085904999751B3C4F9E8C0B03123200@NT-RMNA-0740.brcm.ad.broadcom.com>
 
> Maybe add some of that explanation to teh DESCRIPTION clause then.
 
PROPOSED: modify the description clause to the following (mods are in red):
 
       DESCRIPTION  
            " This object contains the MTA Admin Status of this device. 
              If this object is set to 'true', the MTA is  
              administratively enabled and the MTA MUST be able to  
              interact with the PacketCable entities such as CMS,  
              Provisioning Server, KDC, and other MTAs and MGs on all  
              PacketCable interfaces. 
              If this object is set to 'false', the MTA is  
              administratively disabled and the MTA MUST perform the  
              following actions for all endpoints: 
                  - shutdown all media sessions if present, 
                  - shutdown NCS signaling by following the Restart in 
                  Progress procedures in the PacketCable NCS 
                  specification. 
 
              MTA must execute all actions required to enable/disable the 
              telephony services for all endpoints immediately upon receipt
of 
              the SNMP SET operation. 
 
              Additionally, the MTA MUST maintain the SNMP Interface  
              For management and also SNMP Key management interface.  
              Also, the MTA MUST NOT continue Kerberized key management  
              with CMSes until this object is set to 'true'. 
              Note: MTAs MUST renew the CMS Kerberos tickets according  
              to the PacketCable Security or IPCablecom Specification."     
 
 
Would this modification address your concern ?
 
Eugene.
 


________________________________

From: Wijnen, Bert (Bert) [mailto:[email protected]] 
Sent: Monday, September 12, 2005 2:03 PM
To: Eugene Nechamkin; Jean-Francois Mule; Ipcdn (E-mail)
Cc: Richard Woundy @ Comcast
Subject: RE: AD Review: draft06 draft-ietf-ipcdn-pktc-mtamib-06.txt ( Comm
ent 13)


Maybe add some of that explanation to teh DESCRIPTION clause then.
 
Bert

	-----Original Message-----
	From: Eugene Nechamkin [mailto:[email protected]]
	Sent: Monday, September 12, 2005 22:19
	To: Wijnen, Bert (Bert); Jean-Francois Mule; Ipcdn (E-mail)
	Cc: Richard Woundy @ Comcast
	Subject: RE: AD Review: draft06 draft-ietf-ipcdn-pktc-mtamib-06.txt (
Comm ent 13)
	
	
	> For example, if I set AdminStatus to "enable", and if the device
	> seems unable to do so now, then I would still want the device to
	> try and do it as soon as it can.
	 
	This example tells me where the disconnection might be. Let me try
once more: the PacketCable Provisioning Specification prohibits the
conditions when "the device seems unable to do so now". As soon as the EMTA
receives the SNMP SET with "pktcMtaDevEnabled" being set to true/false, the
device must and is always capable of enabling/disabling the telephony
services on the EMTA. So, there is no scenario which can make "the device to
try and do it as soon as it can" as the device would have executed all
actions required by the corresponding Admin state upon SNMP SET operation.
The conditions of your concern cannot happen in PacketCable environment with
PacketCable compliant EMTA device.
	 
	Please elaborate if this still does no cover your concerns on this
subject.
	 
	Eugene.
	 

________________________________

	From: Wijnen, Bert (Bert) [mailto:[email protected]] 
	Sent: Monday, September 12, 2005 12:53 PM
	To: Eugene Nechamkin; Jean-Francois Mule; Ipcdn (E-mail)
	Cc: Richard Woundy @ Comcast
	Subject: RE: AD Review: draft06 draft-ietf-ipcdn-pktc-mtamib-06.txt (
Comm ent 13)
	
	
	Inline

		-----Original Message-----
		From: Eugene Nechamkin [mailto:[email protected]]
		Sent: Monday, September 12, 2005 21:24
		To: Wijnen, Bert (Bert); Jean-Francois Mule; Ipcdn (E-mail)
		Cc: Richard Woundy @ Comcast
		Subject: RE: AD Review: draft06
draft-ietf-ipcdn-pktc-mtamib-06.txt ( Comment 13)
		
		
		
		 
		Because the message is becoming too big I am separating the
responses for each comment for better trackability (also modifying the title
slightly).
		 
		# Comment 13
		 
		
		> - For pktcMtaDevEnabled a better name woul probably be
		>       pktcMtaDevAdministrativelyEnabled
		>   And how is the NMS going to see what the real Operational
status is?
		>   Is a AdminStatus and OperStatus (as in IF-MIB) not more
appropriate?
		Proposed resolution: no action
		In general, we agree with the comment and our first reaction
was, yes,
		let's rename it and add an operStatus one.
		But after looking at its definition in more details, syntax
		(ThruthValue) and after c
		onsidering a new operStatus object, we think
		that:
		        - pktcMtaDevEnabled is both an admin and operational
status
		          object, hence the name is probably ok,
		        - it returns the operational status of the
enable/disable
		          switch when read.
		Our proposal, after reviewing your comment is still to leave
it as-is.
		Is this ok? if not, can you elaborate?
		 
		> bw: The issue is that if you use one single object for both
the admin's desire of the status and
		> at the same time for the actual operational status, then it
gets difficult. 
		> If you issue an SNMP SET to enable, then if you accept it,
then that means that the value
		> is to be changed to enabled. If however the value then
later changes, then I bet that the
		> management station is at least very surprised. It is not
for nothing that the IF-MIB (after a long
		> experience) has chosed to haev a Admin and Operational
status in two separate objects.
		 
		Let me put some more clarification on the issue which may
address your general concern with the Admin and Operational Status
separation. One of the reasons it would make sense to separate Admin and
Operational status is the potentail delay between the the SNMP SET changing
the Admin Status and actual Operational status of the device including the
case when the device might be not able to set the corresponding Admin status
for some reasons internal to the device. In case of EMTA Enabling/Disabling,
the PacketCable Provisioning spec does not allow such delays and requires the
EMTA to disable/enable the Telephony Services on the EMTA with very minimal
delay (if at all). Hence, from the operational prosective, the separation of
the Admin and Operational Statuses in PacketCable environment does not seem
to be required.
		 
		Hope this clarifies. Please elaborate further otherwise.
		 
		Jean-Francois and Eugene.
		 
		
		bw: nope it does not clarify (at least not for me).
		I always see a difference between what an operator
wants/intends
		(i.e. AdminStatus) and what the device was actually able to
do
		or has done (i.e. OperStatus). The timing as to how fast the 
		device/software has to do it has nothing to do with it it in
my view.
		For example, if I set AdminStatus to "enable", and if the
device
		seems unable to do so now, then I would still want the device
to
		try and do it as soon as it can.
		 
		Bert

_______________________________________________
IPCDN mailing list
[email protected]
https://www1.ietf.org/mailman/listinfo/ipcdn