Interesting tidbit on effort estimation
"Roger Tsang" <[email protected]>
| Newsgroups | gmane.linux.cluster.ssic.devel |
|---|---|
| Message-ID | <[email protected]> |
Hi,
I was reading up
http://www.dwheeler.com/essays/linux-kernel-cost.html#results and
thought we'd punch in some numbers for fun.
Calculating the approximate amount of new kernel code that went into
creating OpenSSI-1.9.6 since last release:
MM-nominal-semidetached = 3*(KSLOC)^1.12 =
= 3* (8)^1.12 = 45.3 MM
Effort-adjustment = 1.15 * 1.0 * 1.65 * 1.11 * 1.0 * 1.15 *
1.0 * 0.86 * 1.0 * 0.86 * 1.0 * 0.95 * 0.91 * 1.0 * 1.0
= 1.54869
MM-adjusted = 45.3 * 1.54869 = 70.2 Man-Months
= 5.85 Man-years of effort to (re)develop
If average salary = $60K/year, and overhead = 2.40, then:
Development cost = 60000*2.4*5.85 = $842,400
Ever wonder what the estimate would be to re-develop OpenSSI from scratch?
-Roger
-------------------------------------------------------------------------
This SF.Net email is sponsored by the Moblin Your Move Developer's challenge
Build the coolest Linux based applications with Moblin SDK & win great prizes
Grand prize is a trip for two to an Open Source event anywhere in the world
http://moblin-contest.org/redirect.php?banner_id=100&url=/