Re: Interesting tidbit on effort estimation

John Hughes <[email protected]>
Newsgroups gmane.linux.cluster.ssic.devel
Message-ID <[email protected]>
Roger Tsang wrote:
> Hi,
>
> I was reading up
> http://www.dwheeler.com/essays/linux-kernel-cost.html#results and
> thought we'd punch in some numbers for fun.
>
> Calculating the approximate amount of new kernel code that went into
> creating OpenSSI-1.9.6 since last release:
>
> MM-nominal-semidetached = 3*(KSLOC)^1.12 =
>   = 3* (8)^1.12 = 45.3 MM
> Effort-adjustment =  1.15 * 1.0 * 1.65 * 1.11 * 1.0 * 1.15 *
>     1.0 * 0.86 * 1.0 * 0.86 * 1.0 * 0.95 * 0.91 * 1.0 * 1.0
>     = 1.54869
> MM-adjusted = 45.3 * 1.54869 = 70.2 Man-Months
>             = 5.85 Man-years of effort to (re)develop
> If average salary = $60K/year, and overhead = 2.40, then:
> Development cost = 60000*2.4*5.85 = $842,400
>
> Ever wonder what the estimate would be to re-develop OpenSSI from scratch?
>
>   
Well, considering it's taken about 28 years to get to this point...

http://en.wikipedia.org/wiki/LOCUS_(operating_system)


-------------------------------------------------------------------------
This SF.Net email is sponsored by the Moblin Your Move Developer's challenge
Build the coolest Linux based applications with Moblin SDK & win great prizes
Grand prize is a trip for two to an Open Source event anywhere in the world
http://moblin-contest.org/redirect.php?banner_id=100&url=/
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.