Fuel dryer
Felix Kersting <[email protected]> Wed, 25 Oct 2006 00:23:49 -0700
| Newsgroups | gmane.org.clubs.gobiodiesel.mixmasters |
|---|---|
| Message-ID | <[email protected]> |
The fuel drier should not have to be torn down for inspection. If there is crud building up in it, there is a process problem that needs to be solved farther upstream (per a conversation I had with Seth). If this is a persistent problem, we may need to run a 3rd wash or ??? Fuel testing will tell us how well the process is working. Where are we on that? When the dryer is moved onto the gravel temporary pad under the roof, the barrel needs to be connected to the wall of the conex with Unistrut and a big strap. When we have a real pad to work on, all equipment will be seismically restrained to meet the building code. The barrel should not be moved away from the tote, as raising it will increase the head on the pump and that will reduce the flow rate of fuel over the fill. Ducting air from the conex is counter productive to achieving class 1/div 2. Always a bad plan to connect the air in the breathing zone to a piece of process equipment. I had suggested a solar air heater for the dryer this summer but it never got built. This is still a good possibility. Seth and I also discussed using a dryer element as an air heater - which is exactly what it is. That's a great "do it at home" project for someone. I will provide a sketch if someone is interested in either project. Hose and disconnects are the wrong direction to go. All the process equipment will eventually be hard piped in steel to meet the fire code. Thanks, Felix