Re: August schedule
Pete Kramer <pete_kramer2-/[email protected]> Wed, 15 Aug 2007 07:53:51 -0700 (PDT)
| Newsgroups | gmane.org.clubs.gobiodiesel.mixmasters |
|---|---|
| Message-ID | <[email protected]> |
--===============0358718119== Content-Type: multipart/alternative; boundary="0-223189450-1187189631=:47338" --0-223189450-1187189631=:47338 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: quoted-printable Tamar,=0A=0AMy time thr/ Sept that I can commit to:=0A=0AAug 29 (Wed) 5-9pm= =0A=0ASept 5 (Wed) 5-9pm=0A=0ASept 24 (Mon) 5-9pm=0A=0AThanks=0A=0APete=0A= =0A=0A----- Original Message ----=0AFrom: "More, Tamar" <[email protected]>=0ATo:= [email protected]=0ASent: Thursday, August 2, 2007 5:34:46 PM= =0ASubject: [mixmasters] August schedule=0A=0A=0ADear mixmasters,=0A=0ABelo= w is the start of the next three weeks of the August fuel work schedule. If= you are not on the schedule and should be, please see if you can fill in s= ome of the missing slots. If you ARE tentatively scheudled, check that I go= t your constraints right and also NOTE that if you are in an incomplete slo= t, indicated by *, you will NOT be able to actually work that shift unless = both conditions below are satisfied:=0A=0A1. All sessions MUST have at leas= t TWO COOP people on-site. They do not both have to be making fuel, but the= y do both have to have signed the waiver. A non-fuel-making workparty does = count.=0A2. All sessions should have at least one lead mixmaster. This will= be difficult at first, as we are still both short on fully trained mixmast= ers and working on the training process itself, so you get to self identify= as to whether you are a lead or not. Until we have a set process, we'll ha= ve to ask that each of you be cautious about your level of experience. =0A= =0ATo this end, we are updating the procedure documentation (the "Brew Book= "). Zac will be sending a draft to Brian today. Brian, could you send the l= atest draft to the list by Sunday (Monday at the latest, so the next shift = has access?) Before each session, PLEASE make a copy of the most recent dra= ft and use it as a guide. There have been a few problems, both large and sm= all. We don't want to stall processing again, but we do also have to get ou= r efforts coordinated and debugged.=0A=0AOK, here is the proposal:=0A=0AMon= day, Aug. 6=0A* Bill Dodds - wants 2-6 I think, but needs company until the= rest arrive=0A5-9 Jordan, Adam, Zac=0A=0AWednesday, Aug 8=0A2-6 Bill, Geor= ge=0A4-8 Tom, Pete=0A=0AThursday, Aug 9=0A* 5-9 Guy, Jordan (do we need an = experienced lead here?)=0A=0AWednesday, Aug 15=0A2-6 George, Bill=0A* 4-8 T= om, (2nd required on site)=0A=0AThursday, Aug 16=0A5-9 Jordan, George=0A=0A= Saturday, Aug 18=0A10-2 Guy, George=0A=0AMonday Aug 20=0A5-9 Adam, George= =0A=0AWednesday Aug. 22=0A* 2-6 Bill ((2nd required on site)=0A* 4-8 Tom (2= nd required on site)=0A=0AThursday, Aug 23=0A* 5-9 Guy, Jordan (do we need = a lead, or do you feel you'll be ready for prime time?)=0A=0AFriday, Aug 24= =0A5-9 Jordan, George=0A=0AStill waiting to hear about scheduling this peri= od from a few of you! Let me know additions/changes/corrections.=0A=0Athank= s=0ATamar=0A=0Aps Sometime at the end of August/early september I will be h= aving a baby, so ideally I would like to get September scheduled well in ad= vance, as in by mid August. That can happen if you all send me your septemb= er info. If I can't get September scheduled by the time Scout shows up, we = will need someone to take over scheduling for a month or two. Any volunteer= s?=0A=0A=0A __________________________________________________________= __________________________=0AFussy? Opinionated? Impossible to please? Perf= ect. Join Yahoo!'s user panel and lay it on us. http://surveylink.yahoo.co= m/gmrs/yahoo_panel_invite.asp?a=3D7 =0A --0-223189450-1187189631=:47338 Content-Type: text/html; charset=us-ascii Content-Transfer-Encoding: quoted-printable <html><head><style type=3D"text/css"><!-- DIV {margin:0px;} --></style></he= ad><body><div style=3D"font-family:times new roman, new york, times, serif;= font-size:12pt"><DIV style=3D"FONT-SIZE: 12pt; FONT-FAMILY: times new roman= , new york, times, serif">Tamar,</DIV>=0A<DIV style=3D"FONT-SIZE: 12pt; FON= T-FAMILY: times new roman, new york, times, serif"> </DIV>=0A<DIV styl= e=3D"FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new york, times, serif"= >My time thr/ Sept that I can commit to:</DIV>=0A<DIV style=3D"FONT-SIZE: 1= 2pt; FONT-FAMILY: times new roman, new york, times, serif"> </DIV>=0A<= DIV style=3D"FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new york, times= , serif">Aug 29 (Wed) 5-9pm</DIV>=0A<DIV style=3D"FONT-SIZE: 12pt; FONT-FAM= ILY: times new roman, new york, times, serif"> </DIV>=0A<DIV style=3D"= FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new york, times, serif">Sept= 5 (Wed) 5-9pm</DIV>=0A<DIV style=3D"FONT-SIZE: 12pt; FONT-FAMILY: times ne= w roman, new york, times, serif"> </DIV>=0A<DIV style=3D"FONT-SIZE: 12= pt; FONT-FAMILY: times new roman, new york, times, serif">Sept 24 (Mon) 5-9= pm</DIV>=0A<DIV style=3D"FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new= york, times, serif"> </DIV>=0A<DIV style=3D"FONT-SIZE: 12pt; FONT-FAM= ILY: times new roman, new york, times, serif">Thanks</DIV>=0A<DIV style=3D"= FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new york, times, serif">&nbs= p;</DIV>=0A<DIV style=3D"FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new= york, times, serif">Pete<BR><BR></DIV>=0A<DIV style=3D"FONT-SIZE: 12pt; FO= NT-FAMILY: times new roman, new york, times, serif">----- Original Message = ----<BR>From: "More, Tamar" <[email protected]><BR>To: [email protected]= urcery.com<BR>Sent: Thursday, August 2, 2007 5:34:46 PM<BR>Subject: [mixmas= ters] August schedule<BR><BR>=0A<DIV>Dear mixmasters,<BR><BR>Below is the s= tart of the next three weeks of the August fuel work schedule. If you are n= ot on the schedule and should be, please see if you can fill in some of the= missing slots. If you ARE tentatively scheudled, check that I got your con= straints right and also NOTE that if you are in an incomplete slot, indicat= ed by *, you will NOT be able to actually work that shift unless both condi= tions below are satisfied:<BR><BR>1. All sessions MUST have at least TWO CO= OP people on-site. They do not both have to be making fuel, but they do bot= h have to have signed the waiver. A non-fuel-making workparty does count.<B= R>2. All sessions should have at least one lead mixmaster. This will be dif= ficult at first, as we are still both short on fully trained mixmasters and= working on the training process itself, so you get to self identify as to = whether you are a lead or not. Until we have a set process, we'll have to a= sk that each of you be cautious about your level of experience. <BR><BR>To this end, we are updat= ing the procedure documentation (the "Brew Book"). Zac will be sending a dr= aft to Brian today. Brian, could you send the latest draft to the list by S= unday (Monday at the latest, so the next shift has access?) Before each ses= sion, PLEASE make a copy of the most recent draft and use it as a guide. Th= ere have been a few problems, both large and small. We don't want to stall = processing again, but we do also have to get our efforts coordinated and de= bugged.<BR><BR>OK, here is the proposal:<BR><BR>Monday, Aug. 6<BR>* Bill Do= dds - wants 2-6 I think, but needs company until the rest arrive<BR>5-9 Jor= dan, Adam, Zac<BR><BR>Wednesday, Aug 8<BR>2-6 Bill, George<BR>4-8 Tom, Pete= <BR><BR>Thursday, Aug 9<BR>* 5-9 Guy, Jordan (do we need an experienced lea= d here?)<BR><BR>Wednesday, Aug 15<BR>2-6 George, Bill<BR>* 4-8 Tom, (2nd re= quired on site)<BR><BR>Thursday, Aug 16<BR>5-9 Jordan, George<BR><BR>Saturday, Aug 18<BR>10-2 Guy, George<BR><BR>Monday Aug 20<BR= >5-9 Adam, George<BR><BR>Wednesday Aug. 22<BR>* 2-6 Bill ((2nd required on = site)<BR>* 4-8 Tom (2nd required on site)<BR><BR>Thursday, Aug 23<BR>* 5-9 = Guy, Jordan (do we need a lead, or do you feel you'll be ready for prime ti= me?)<BR><BR>Friday, Aug 24<BR>5-9 Jordan, George<BR><BR>Still waiting to he= ar about scheduling this period from a few of you! Let me know additions/ch= anges/corrections.<BR><BR>thanks<BR>Tamar<BR><BR>ps Sometime at the end of = August/early september I will be having a baby, so ideally I would like to = get September scheduled well in advance, as in by mid August. That can happ= en if you all send me your september info. If I can't get September schedul= ed by the time Scout shows up, we will need someone to take over scheduling= for a month or two. Any volunteers?</DIV></DIV>=0A<DIV style=3D"FONT-SIZE:= 12pt; FONT-FAMILY: times new roman, new york, times, serif"><BR></DIV></di= v><br>=0A <hr size=3D1>Got a little couch potato? <br>=0ACheck out fun= <a href=3D"http://us.rd.yahoo.com/evt=3D48248/*http://search.yahoo.com/sea= rch?fr=3Doni_on_mail&p=3Dsummer+activities+for+kids&cs=3Dbz">summer activit= ies for kids.</a></body></html> --0-223189450-1187189631=:47338-- --===============0358718119== Content-Type: text/plain; charset="us-ascii" MIME-Version: 1.0 Content-Transfer-Encoding: 7bit Content-Disposition: inline _______________________________________________ mixmasters mailing list [email protected] http://lists.gobiodiesel.org/mailman/listinfo/mixmasters --===============0358718119==--