Re: August schedule

Pete Kramer <pete_kramer2-/[email protected]> Wed, 15 Aug 2007 07:53:51 -0700 (PDT)
Newsgroups gmane.org.clubs.gobiodiesel.mixmasters
Message-ID <[email protected]>
--===============0358718119==
Content-Type: multipart/alternative; boundary="0-223189450-1187189631=:47338"

--0-223189450-1187189631=:47338
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: quoted-printable

Tamar,=0A=0AMy time thr/ Sept that I can commit to:=0A=0AAug 29 (Wed) 5-9pm=
=0A=0ASept 5 (Wed) 5-9pm=0A=0ASept 24 (Mon) 5-9pm=0A=0AThanks=0A=0APete=0A=
=0A=0A----- Original Message ----=0AFrom: "More, Tamar" <[email protected]>=0ATo:=
 [email protected]=0ASent: Thursday, August 2, 2007 5:34:46 PM=
=0ASubject: [mixmasters] August schedule=0A=0A=0ADear mixmasters,=0A=0ABelo=
w is the start of the next three weeks of the August fuel work schedule. If=
 you are not on the schedule and should be, please see if you can fill in s=
ome of the missing slots. If you ARE tentatively scheudled, check that I go=
t your constraints right and also NOTE that if you are in an incomplete slo=
t, indicated by *, you will NOT be able to actually work that shift unless =
both conditions below are satisfied:=0A=0A1. All sessions MUST have at leas=
t TWO COOP people on-site. They do not both have to be making fuel, but the=
y do both have to have signed the waiver. A non-fuel-making workparty does =
count.=0A2. All sessions should have at least one lead mixmaster. This will=
 be difficult at first, as we are still both short on fully trained mixmast=
ers and working on the training process itself, so you get to self identify=
 as to whether you are a lead or not. Until we have a set process, we'll ha=
ve to ask that each of you be cautious about your level of experience. =0A=
=0ATo this end, we are updating the procedure documentation (the "Brew Book=
"). Zac will be sending a draft to Brian today. Brian, could you send the l=
atest draft to the list by Sunday (Monday at the latest, so the next shift =
has access?) Before each session, PLEASE make a copy of the most recent dra=
ft and use it as a guide. There have been a few problems, both large and sm=
all. We don't want to stall processing again, but we do also have to get ou=
r efforts coordinated and debugged.=0A=0AOK, here is the proposal:=0A=0AMon=
day, Aug. 6=0A* Bill Dodds - wants 2-6 I think, but needs company until the=
 rest arrive=0A5-9 Jordan, Adam, Zac=0A=0AWednesday, Aug 8=0A2-6 Bill, Geor=
ge=0A4-8 Tom, Pete=0A=0AThursday, Aug 9=0A* 5-9 Guy, Jordan (do we need an =
experienced lead here?)=0A=0AWednesday, Aug 15=0A2-6 George, Bill=0A* 4-8 T=
om, (2nd required on site)=0A=0AThursday, Aug 16=0A5-9 Jordan, George=0A=0A=
Saturday, Aug 18=0A10-2 Guy, George=0A=0AMonday Aug 20=0A5-9 Adam, George=
=0A=0AWednesday Aug. 22=0A* 2-6 Bill ((2nd required on site)=0A* 4-8 Tom (2=
nd required on site)=0A=0AThursday, Aug 23=0A* 5-9 Guy, Jordan (do we need =
a lead, or do you feel you'll be ready for prime time?)=0A=0AFriday, Aug 24=
=0A5-9 Jordan, George=0A=0AStill waiting to hear about scheduling this peri=
od from a few of you! Let me know additions/changes/corrections.=0A=0Athank=
s=0ATamar=0A=0Aps Sometime at the end of August/early september I will be h=
aving a baby, so ideally I would like to get September scheduled well in ad=
vance, as in by mid August. That can happen if you all send me your septemb=
er info. If I can't get September scheduled by the time Scout shows up, we =
will need someone to take over scheduling for a month or two. Any volunteer=
s?=0A=0A=0A      __________________________________________________________=
__________________________=0AFussy? Opinionated? Impossible to please? Perf=
ect.  Join Yahoo!'s user panel and lay it on us. http://surveylink.yahoo.co=
m/gmrs/yahoo_panel_invite.asp?a=3D7 =0A
--0-223189450-1187189631=:47338
Content-Type: text/html; charset=us-ascii
Content-Transfer-Encoding: quoted-printable

<html><head><style type=3D"text/css"><!-- DIV {margin:0px;} --></style></he=
ad><body><div style=3D"font-family:times new roman, new york, times, serif;=
font-size:12pt"><DIV style=3D"FONT-SIZE: 12pt; FONT-FAMILY: times new roman=
, new york, times, serif">Tamar,</DIV>=0A<DIV style=3D"FONT-SIZE: 12pt; FON=
T-FAMILY: times new roman, new york, times, serif">&nbsp;</DIV>=0A<DIV styl=
e=3D"FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new york, times, serif"=
>My time thr/ Sept that I can commit to:</DIV>=0A<DIV style=3D"FONT-SIZE: 1=
2pt; FONT-FAMILY: times new roman, new york, times, serif">&nbsp;</DIV>=0A<=
DIV style=3D"FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new york, times=
, serif">Aug 29 (Wed) 5-9pm</DIV>=0A<DIV style=3D"FONT-SIZE: 12pt; FONT-FAM=
ILY: times new roman, new york, times, serif">&nbsp;</DIV>=0A<DIV style=3D"=
FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new york, times, serif">Sept=
 5 (Wed) 5-9pm</DIV>=0A<DIV style=3D"FONT-SIZE: 12pt; FONT-FAMILY: times ne=
w roman, new york, times, serif">&nbsp;</DIV>=0A<DIV style=3D"FONT-SIZE: 12=
pt; FONT-FAMILY: times new roman, new york, times, serif">Sept 24 (Mon) 5-9=
pm</DIV>=0A<DIV style=3D"FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new=
 york, times, serif">&nbsp;</DIV>=0A<DIV style=3D"FONT-SIZE: 12pt; FONT-FAM=
ILY: times new roman, new york, times, serif">Thanks</DIV>=0A<DIV style=3D"=
FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new york, times, serif">&nbs=
p;</DIV>=0A<DIV style=3D"FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new=
 york, times, serif">Pete<BR><BR></DIV>=0A<DIV style=3D"FONT-SIZE: 12pt; FO=
NT-FAMILY: times new roman, new york, times, serif">----- Original Message =
----<BR>From: "More, Tamar" &lt;[email protected]&gt;<BR>To: [email protected]=
urcery.com<BR>Sent: Thursday, August 2, 2007 5:34:46 PM<BR>Subject: [mixmas=
ters] August schedule<BR><BR>=0A<DIV>Dear mixmasters,<BR><BR>Below is the s=
tart of the next three weeks of the August fuel work schedule. If you are n=
ot on the schedule and should be, please see if you can fill in some of the=
 missing slots. If you ARE tentatively scheudled, check that I got your con=
straints right and also NOTE that if you are in an incomplete slot, indicat=
ed by *, you will NOT be able to actually work that shift unless both condi=
tions below are satisfied:<BR><BR>1. All sessions MUST have at least TWO CO=
OP people on-site. They do not both have to be making fuel, but they do bot=
h have to have signed the waiver. A non-fuel-making workparty does count.<B=
R>2. All sessions should have at least one lead mixmaster. This will be dif=
ficult at first, as we are still both short on fully trained mixmasters and=
 working on the training process itself, so you get to self identify as to =
whether you are a lead or not. Until we have a set process, we'll have to a=
sk that each of you be
 cautious about your level of experience. <BR><BR>To this end, we are updat=
ing the procedure documentation (the "Brew Book"). Zac will be sending a dr=
aft to Brian today. Brian, could you send the latest draft to the list by S=
unday (Monday at the latest, so the next shift has access?) Before each ses=
sion, PLEASE make a copy of the most recent draft and use it as a guide. Th=
ere have been a few problems, both large and small. We don't want to stall =
processing again, but we do also have to get our efforts coordinated and de=
bugged.<BR><BR>OK, here is the proposal:<BR><BR>Monday, Aug. 6<BR>* Bill Do=
dds - wants 2-6 I think, but needs company until the rest arrive<BR>5-9 Jor=
dan, Adam, Zac<BR><BR>Wednesday, Aug 8<BR>2-6 Bill, George<BR>4-8 Tom, Pete=
<BR><BR>Thursday, Aug 9<BR>* 5-9 Guy, Jordan (do we need an experienced lea=
d here?)<BR><BR>Wednesday, Aug 15<BR>2-6 George, Bill<BR>* 4-8 Tom, (2nd re=
quired on site)<BR><BR>Thursday, Aug 16<BR>5-9 Jordan,
 George<BR><BR>Saturday, Aug 18<BR>10-2 Guy, George<BR><BR>Monday Aug 20<BR=
>5-9 Adam, George<BR><BR>Wednesday Aug. 22<BR>* 2-6 Bill ((2nd required on =
site)<BR>* 4-8 Tom (2nd required on site)<BR><BR>Thursday, Aug 23<BR>* 5-9 =
Guy, Jordan (do we need a lead, or do you feel you'll be ready for prime ti=
me?)<BR><BR>Friday, Aug 24<BR>5-9 Jordan, George<BR><BR>Still waiting to he=
ar about scheduling this period from a few of you! Let me know additions/ch=
anges/corrections.<BR><BR>thanks<BR>Tamar<BR><BR>ps Sometime at the end of =
August/early september I will be having a baby, so ideally I would like to =
get September scheduled well in advance, as in by mid August. That can happ=
en if you all send me your september info. If I can't get September schedul=
ed by the time Scout shows up, we will need someone to take over scheduling=
 for a month or two. Any volunteers?</DIV></DIV>=0A<DIV style=3D"FONT-SIZE:=
 12pt; FONT-FAMILY: times new roman, new york, times, serif"><BR></DIV></di=
v><br>=0A      <hr size=3D1>Got a little couch potato? <br>=0ACheck out fun=
 <a href=3D"http://us.rd.yahoo.com/evt=3D48248/*http://search.yahoo.com/sea=
rch?fr=3Doni_on_mail&p=3Dsummer+activities+for+kids&cs=3Dbz">summer activit=
ies for kids.</a></body></html>
--0-223189450-1187189631=:47338--

--===============0358718119==
Content-Type: text/plain; charset="us-ascii"
MIME-Version: 1.0
Content-Transfer-Encoding: 7bit
Content-Disposition: inline

_______________________________________________
mixmasters mailing list
[email protected]
http://lists.gobiodiesel.org/mailman/listinfo/mixmasters
--===============0358718119==--