Re: Any news?
Richard Hult <[email protected]> 22 Apr 2003 13:51:15 +0200
| Newsgroups | gmane.comp.gnome.apps.mr-project.devel |
|---|---|
| Organization | CodeFactory AB |
| Message-ID | <[email protected]> |
l=F6r 2003-04-19 klockan 18.29 skrev Benjamin BAYART: > I got a look at the drag'n'drop stuff and found a funny behaviour of the > current Gantt Chart/Row on that point: What is changed by the > drag-duration is not the duration, but the work, which have strange > effect. >=20 > Suppose a task that have a duration of 2 days, and a work of 4 days, and > a resource assigned to it, the resource is assigned at 200%. When you > drag it's duration, and change your mind, get back to 2 days, and > release the button, the *work* is set to 2 days, and so the duration is > half what you expected graphically. >=20 > In my guess, what you *see* on the chart is a duration, not a work... > Should this considered a bug? Is it already in bugzilla? Should I fill > it? What behaviour should I adopt for the same functionality in my view? It's a bug. What you see in the gantt chart is the duration, and when you drag a bar, it should set the work required to achieve the specified duration. Somehow, this is messed up right now when having an assignment other than 100%. Also, I guess we should set the duration instead of work for tasks that use fixed duration mode. I just added two bugs reports to the bugzilla about this (#638, #639). Regards, Richard=20 --=20 Richard Hult [email protected] CodeFactory AB http://www.codefactory.se/