LVS failover sequence
"Terry, Jason" <[email protected]>
| Newsgroups | gmane.linux.highavailability.ultramonkey |
|---|---|
| Message-ID | <[email protected]> |
I'm testing failover on a "Streamline Highly Availability and Load Balancing" configuration. When heartbeat fails, or is stopped, the new director takes control before it has completed initialization. Basically this means that most of my virtual services are still pointing to the fallback server for a while. (a few seconds for each virtual services) Since I'm planning on balancing over 30 virtual services this will mean that my server is down for over 1 minute before the director has initialized. Is there a way to have the backup director on hot standby to prevent this initialization time? Thanks -Jason -- Ultra Monkey - http://www.ultramonkey.org/ To UNSUBSCRIBE, email to [email protected], with a body: unsubscribe ultramonkey-users [email protected] where "[email protected]" is YOUR email address.