Re: Things to do on site
Pete Kramer <[email protected]>
| Newsgroups | gmane.org.clubs.gobiodiesel |
|---|---|
| Message-ID | <[email protected]> |
Thanks for the update Felix. If you can make it out to the site this Sat, we could sure use the extra hands to help with the concrete. Sounds like this is THE #1 thing that needs to be handled right now. I will be down there starting around 9am. We need wheel barrels, you have 1 or more to share?.. We will be moving the concrete and creating a retaining wall at teh far end of the site. Hope to see you and I think I am on the site planning list, but don't think I have seen any chatter there?.. Pete Felix Kersting <[email protected]> wrote: Tom's ideas about what to do at the site are ok, but I am acting as the contact with the DEQ and City of Milwaukie. I haven't seen anything more than the letter from the city to Brian. If there is new information from the city, please let me know. There is no time crisis with DEQ or the City of Milwaukie - I have talked to both fellows who were at the site. They want a plan from us, but not within the 30 days stated in the letter. The deadline had to do with moving the Blue Sky pump and removing the rat harborage - concrete and brush piles - I know Seth has called for work party help to take care of this but as of 2 weeks ago there was no progress. Building the cover for the outside processor area was nixed by site group earlier this year. If we want to revisit this decision, lets discuss it at a meeting. I am available many weeknights, but am doing some traveling again with my new job. Any containment needs to have a way to deal with rain and flood water and safely dispose of water that accumulates. Plastic under gravel doesn't meet any codes and can't be checked for accumulation or leaks. Currently we are thinking concrete containment basin. DEQ technically has no jurisdiction in the matter (but could in the future), and says they will be cool with whatever the fire marshal asks for. I have reviewed the fire code and containment issues and don't agree with Tom's interpretation of the containment requirement. It is more like 100% of the volume on site plus 10% or 24 hours of maximum rainfall but we should discuss with the fire marshal. Having everything lashed down in case of a flood is at least as important. Currently it appears we will tell the city we expect to have 4k to 8k gallons of veg oil & bioD on site and need to demonstrate to them we understand how to safely store and use it. I have no heartburn with a temporary shelter, but it may need to come down when the complete site plan is developed. I can't say if the coop wants to spend funds on this project, especially if it is temporary. We DO need a solar air heater for the drying system...... If you are interested in site planning issues, please subscribe to the siteplan list. That's a great place for these discussions. I have been lying low because I am focused on my new job. I will try to be on site this weekend, but may not be there for work parties. Thanks, Felix Kersting _______________________________________________ pdx-biodiesel mailing list [email protected] http://lists.gobiodiesel.org/mailman/listinfo/pdx-biodiesel --------------------------------- Yahoo! Messenger with Voice. Make PC-to-Phone Calls to the US (and 30+ countries) for 2¢/min or less.