Turnaround time for accepting new ports?
Lloyd Hilaiel <[email protected]>
| Newsgroups | gmane.os.opendarwin.darwinports |
|---|---|
| Message-ID | <[email protected]> |
Hey all, Don't mean to gripe, I'm just curious... But I submitted a port of the sawfish window manager and required libraries (librep and rep-gtk): http://bugzilla.opendarwin.org/show_bug.cgi?id=10292 http://bugzilla.opendarwin.org/show_bug.cgi?id=10293 http://bugzilla.opendarwin.org/show_bug.cgi?id=10295 And was wondering how long it usually takes for ports to get accepted and integrated into the distribution system? Best, lloyd